Upstream Oil and Gas Selected projects
- Jack-up barge leg failure
- Life extension of jack ups
- Fatigue life extension of floating structures
- Life extension of semi-sub drilling units
- Spud can/chord cracking in jack-up rig
- Review of specifications for a TLP
- Repair of semi-sub production unit
- Semi-sub rig conversion
- Engineering critical assessment of cracked column in semi sub rig
- Fatigue design of tether for a TLP
- Materials characterisation for TLP tethers
- Inspection of jack-up rig
- Fracture and fatigue assessment of FPSO hull
- FPSO fatigue design review
- Consultancy on FPSO subsea development
- FPSO structures - failure and repair
- Complementary inspection of FPSO turret welds by phased array
- Fatigue life improvement of FPSO hull critical components
- ECA and inspection review of FPSO turret welds
- Topside process system weld checks
- Cracking in hyperbaric repair welds
- Underwater friction welding trials
- Mooring support structure connection review
- ECA and development of in-situ repair for FPSO turret welds
- Fatigue life extension of floating structures
- Life extension of semi-submersible drilling units
- Failure of a single leg mooring
- Corrosion of welds in low alloys steels
- Failure in a flare stack
- Fatigue design review
- Repair of semi-submersible production unit
- Semi-submersible rig conversion
